112SUB-OBPO24 is the subject of this archived article from 2024. It concerned joint energy-efficiency investments in older apartment buildings. Before planning a new investment, check the current call, its conditions and whether applications are open.
The 112SUB-OBPO24 measures
The original call, discussed in March 2024, covered insulation of external walls, roofs and floors, together with heating-system optimisation. The eligible scope and supporting documents were defined in the call.
The archived article described support of up to 30% of recognised costs for measures A, B and C, subject to area caps. It described up to 50% for measure D and specific support arrangements for qualifying recipients of social benefits.
Historical amounts in the original article
- External wall insulation: up to €35/m², within the percentage limit.
- Flat roof insulation: up to €35/m².
- Pitched roof or ceiling towards an unheated attic: up to €20/m².
- Floors on the ground or over an unheated space: up to €20/m².
- Heating optimisation: up to €70 per heating element, within the relevant limit.
These figures describe the 2024 article and must not be used as current rates. The full call defines recognised costs, exceptions and evidence. A headline percentage is not a calculation of the grant for a particular building.
Project documentation for renovation
XPLAN prepares PZI documentation for envelope renovation, including façades, roofs, attics and basements. The scope is developed around the building and applicable requirements.
The work may include a technical report, thermal calculations, proposed layer build-ups, drawings and junction details. A bill of quantities and designer’s estimate support tendering. Required forms, location information and statements are prepared for the relevant commission.
Resolve details before execution
Roof edges, balconies, windows, plinths and drainage need coordination. A generic insulation thickness does not resolve these interfaces. Fire performance and the suitability of the complete system also need attention.
Reliable existing-building information helps identify these details before the contractor starts. A 3D building survey can provide additional context. The model supports the designer and does not replace design work.
Check the current funding route
Consult Eko sklad for the current public calls and official documents. Archived forms should be checked before use. Eligibility and the amount are determined through the relevant process, not by this overview.
Read our dated 2026 finance overview, PZI renovation guide and supervision service. Send your building details through the contact form to review the project inputs while keeping 112SUB-OBPO24 in its 2024 context.