Professional care throughout construction supervision

Construction supervision checks execution against the permit, project documentation and applicable requirements. It also helps the client address technical questions while the work is still accessible. Agree the appointment and the scope before construction begins.

The service is performed under an agreed contract with the appropriately authorised professional. Our service information identifies civil engineer Branko Manič, IZS PI G-4551. Clients can check professional status in the Slovenian Chamber of Engineers register.

We aim for constructive communication between the client, contractor and designers. The purpose is to identify the issue, establish the relevant requirement and coordinate a workable response. Findings and agreed changes should be traceable.

Our approach

gradbeni nadzor

Professional communication

Work through the technical questions with the people involved.

Nov pravilnik o graditvi objektov

Constructive review

Identify the issue and coordinate the response.

An agreed scope

Define the services around the project and its stage.

Core construction supervision tasks

  • Follow the quality of execution and report identified deficiencies.
  • Check products, materials and the associated supporting documents.
  • Review execution against the relevant design and permit requirements.
  • Follow up the correction of defects and outstanding issues.
  • Coordinate necessary changes with the designer and inform the client.
  • Check the recording of changes during construction.
  • Participate in the required measurements, tests and inspections.
  • Review the relevant completion documentation.

Where irregularities are identified, the required response depends on their nature and the applicable rules. Serious issues may require work to stop while the necessary measures are established.

Need construction supervision for your project?

Tell us about the location, project stage and planned construction programme.

    * Required fields. If the area or number of storeys is not yet known, please say so.

    The town or municipality is enough to start. You can add the exact address in your description.

    Which services do you need? *

    You can select more than one service. Relevant follow-up questions will appear.

    Answer only the follow-up questions relevant to your selected services. All sections are shown without JavaScript.

    Details for the structural engineer’s opinion

    If you represent the owner, answer according to the client’s ownership.

    New-build details

    Renovation details
    Type of renovation *

    For a partial renovation, give the area being renovated instead of the whole building.

    Coordinating design and site work

    Architecture, structure and installations must form a coordinated set. PZI develops the construction solutions and instructions. A proposed change can affect several disciplines, even when it looks small on site.

    Resolve the change with the responsible designer before it is concealed. Keep the decision, revised drawing and supporting information together. This helps the contractor build the agreed solution and supports the completion documentation.

    Useful questions

    A clear professional appointment

    The service is performed under an agreed contract with the appropriately authorised professional. Our service information identifies civil engineer Branko Manič, IZS PI G-4551. Clients can check professional status in the Slovenian Chamber of Engineers register.

    We aim for constructive communication between the client, contractor and designers. The purpose is to identify the issue, establish the relevant requirement and coordinate a workable response. Findings and agreed changes should be traceable.

    Architecture, structure and installations must form a coordinated set. PZI develops the construction solutions and instructions. A proposed change can affect several disciplines, even when it looks small on site.

    Core supervision responsibilities

    • Follow the quality of execution and report identified deficiencies.
    • Check products, materials and the associated supporting documents.
    • Review execution against the relevant design and permit requirements.
    • Follow up the correction of defects and outstanding issues.
    • Coordinate necessary changes with the designer and inform the client.
    • Check the recording of changes during construction.
    • Participate in the required measurements, tests and inspections.
    • Review the relevant completion documentation.

    Where irregularities are identified, the required response depends on their nature and the applicable rules. Serious issues may require work to stop while the necessary measures are established.

    Commercial and organisational support should be defined separately from the core statutory role. Depending on the commission, additional tasks can include a pre-construction review, tender assistance, quantity tracking and financial monitoring.

    We can agree the review of interim and final payment statements, consideration of contractor claims, participation in handover and support during the warranty period. The scope, reporting and responsibilities must be clear to everyone involved.

    Read our comparison of core and extended supervision for the distinction between these services.

    Agree the construction supervision appointment and scope before construction begins. Inspection arrangements need to follow the planned stages of the works.

    A second review of an unresolved issue

    We first examine the available documentation and the current question. We can then identify the relevant specialist and agree the scope of the next review.

    Reinforcement, waterproofing, connections and other concealed details need timely inspection. The contractor and supervisor should agree when each stage will be ready. A finished surface cannot show every detail beneath it.

    Our retaining wall example illustrates the connection between geometry, reinforcement and execution. Ground and water assumptions also need confirmation when excavation starts.

    Collect product information, tests, measurements and change records during the works. Leaving this until handover can make completion difficult. Our guide to supervision, PZI, PID and DZO explains the different documents.

    Nadzor nad gradnjo

    Discuss construction supervision for your project

    Send the location, stage of construction, expected programme and available drawings through our contact form. We can then define the required disciplines, inspection arrangements and any additional support in a project-specific quotation.